Which team needs attention, in which area, and with whom — with the evidence behind each finding
| Model | Machine Runs | TOTAL PRODUCTION | Their Rejection | Model Baseline | Difference | OEE |
|---|---|---|---|---|---|---|
| Style 640-17 5H | 9 | 526 | 5.3% | 5.0% | +0.3 | 78% |
| R69 -18 ET-40-57 | 2 | 209 | 4.3% | 8.0% | -3.7 | 88% |
| Style 640-16 5H | 2 | 203 | 9.4% | 6.3% | +3.0 | 77% |
| SMX201X-22 | 4 | 180 | 15.0% | 9.5% | +5.5 | 49% |
| 444-18 4H | 1 | 79 | 5.1% | 4.3% | +0.7 | 75% |
| 666-18 5H | 1 | 72 | 8.3% | 6.6% | +1.8 | 74% |
| 666-17 5H | 1 | 55 | 7.3% | 5.5% | +1.8 | 48% |
| 444-17 5H | 1 | 32 | 15.6% | 6.1% | +9.5 | 62% |
| R62 ET- 45-52 | 1 | 23 | 4.3% | 7.0% | -2.6 | 100% |
| CV98-20 | 1 | 21 | 0.0% | 6.5% | -6.5 | 40% |
| CV44-22 | 1 | 20 | 0.0% | 0.0% | +0.0 | 0% |
| M/C No. | Machine Runs | TOTAL PRODUCTION | Rejection % | Total Downtime | OEE |
|---|---|---|---|---|---|
| 4 | 6 | 503 | 7.4% | 510 min | 67% |
| 7 | 5 | 339 | 4.7% | 210 min | 81% |
| 16 | 4 | 276 | 8.0% | 80 min | 81% |
| 5 | 3 | 108 | 8.3% | 260 min | 50% |
| 6 | 2 | 22 | 4.5% | 680 min | 100% |
| 14 | 2 | 80 | 15.0% | 180 min | 47% |
| 17 | 1 | 20 | 0.0% | 0 min | 0% |
| 15 | 1 | 72 | 8.3% | 60 min | 74% |
| Reason | Minutes | Share of Downtime |
|---|---|---|
| Rework systemic | 940 min | 47.5 |
| Mech | 680 min | 34.3 |
| Trouble Shooting | 90 min | 4.5 |
| Elec | 90 min | 4.5 |
| Metal Pouring & Dross Cleaning | 90 min | 4.5 |
| Metal Delay | 60 min | 3.0 |
| Over Cycle Time | 30 min | 1.5 |