🏠 Overview ›👤 Leonardo Olvera
RUNS ANALYSED
24
1,420 Units
ACTUAL REJECTION
7.3%
their own output
EXPECTED REJECTION
6.3%
for their model mix
GAP VS EXPECTED
+1.0
percentage points
🧭
Assessment
Compared like-for-like against the models they were assigned
⚪ Within the expected range. Leonardo Olvera performs in line with the rejection expected for the models they were assigned. No follow-up needed on quality grounds.
⚖ Rejection here is measured against the models this person was actually assigned, not a plant-wide average. Someone given harder models should not appear worse for running them. Figures cover a single import period and reflect output only — they do not capture experience, shift conditions, or workload.
🧩
Models Run
Their result on each model against everyone else's result on the same model
ModelMachine Runs TOTAL PRODUCTION Their Rejection Model Baseline DifferenceOEE
Style 640-17 5H 9 526 5.3% 5.0% +0.3 78%
R69 -18 ET-40-57 2 209 4.3% 8.0% -3.7 88%
Style 640-16 5H 2 203 9.4% 6.3% +3.0 77%
SMX201X-22 4 180 15.0% 9.5% +5.5 49%
444-18 4H 1 79 5.1% 4.3% +0.7 75%
666-18 5H 1 72 8.3% 6.6% +1.8 74%
666-17 5H 1 55 7.3% 5.5% +1.8 48%
444-17 5H 1 32 15.6% 6.1% +9.5 62%
R62 ET- 45-52 1 23 4.3% 7.0% -2.6 100%
CV98-20 1 21 0.0% 6.5% -6.5 40%
CV44-22 1 20 0.0% 0.0% +0.0 0%
🏭
Machines Operated
Where they worked, and how each machine performed
M/C No.Machine Runs TOTAL PRODUCTIONRejection % Total DowntimeOEE
4 6 503 7.4% 510 min 67%
7 5 339 4.7% 210 min 81%
16 4 276 8.0% 80 min 81%
5 3 108 8.3% 260 min 50%
6 2 22 4.5% 680 min 100%
14 2 80 15.0% 180 min 47%
17 1 20 0.0% 0 min 0%
15 1 72 8.3% 60 min 74%
⏱
Downtime by Reason
Downtime recorded during their runs
ReasonMinutesShare of Downtime
Rework systemic 940 min 47.5
Mech 680 min 34.3
Trouble Shooting 90 min 4.5
Elec 90 min 4.5
Metal Pouring & Dross Cleaning 90 min 4.5
Metal Delay 60 min 3.0
Over Cycle Time 30 min 1.5