🏠 Overview ›👤 Mohammed Juma Al Jabri
RUNS ANALYSED
18
1,211 Units
ACTUAL REJECTION
6.7%
their own output
EXPECTED REJECTION
6.6%
for their model mix
GAP VS EXPECTED
+0.0
percentage points
🧭
Assessment
Compared like-for-like against the models they were assigned
⚪ Within the expected range. Mohammed Juma Al Jabri performs in line with the rejection expected for the models they were assigned. No follow-up needed on quality grounds.
⚖ Rejection here is measured against the models this person was actually assigned, not a plant-wide average. Someone given harder models should not appear worse for running them. Figures cover a single import period and reflect output only — they do not capture experience, shift conditions, or workload.
🧩
Models Run
Their result on each model against everyone else's result on the same model
ModelMachine Runs TOTAL PRODUCTION Their Rejection Model Baseline DifferenceOEE
Style 640-17 5H 9 710 5.8% 5.0% +0.7 81%
777-18 5H 2 139 8.6% 5.0% +3.7 67%
R62 ET- 45-52 1 98 4.1% 7.0% -2.9 59%
SMX201X-22 1 82 3.7% 9.5% -5.9 86%
666-17 5H 1 60 0.0% 5.5% -5.5 0%
BORO112-18 1 48 12.5% 11.0% +1.5 40%
777-17 4h 1 47 14.9% 23.7% -8.9 48%
222-18 5H 1 17 23.5% 12.2% +11.3 34%
Style 640-15 5H 1 10 40.0% 13.7% +26.3 43%
🏭
Machines Operated
Where they worked, and how each machine performed
M/C No.Machine Runs TOTAL PRODUCTIONRejection % Total DowntimeOEE
7 4 195 10.3% 180 min 69%
16 4 284 8.1% 330 min 61%
6 4 312 6.4% 70 min 71%
4 2 206 2.4% 0 min 90%
15 2 72 13.9% 120 min 54%
14 1 82 3.7% 0 min 86%
5 1 60 0.0% 120 min 0%
⏱
Downtime by Reason
Downtime recorded during their runs
ReasonMinutesShare of Downtime
Elec 360 min 43.9
Rework systemic 130 min 15.9
Startup Loss / Specific Gravity Issue (min) 120 min 14.6
DCO (unplanned & >60min) 120 min 14.6
Over Cycle Time 60 min 7.3
Metal Pouring & Dross Cleaning 30 min 3.7