๐Ÿ  Overview โ€บTeam A
FOLLOW-UP SCORE
16
7 findings
Shifts
1
57 Machine Runs
Rejection %
8.4%
plant avg 6.8%
OEE
64.5%
plant avg 69.7%
๐Ÿ“‹
Team A โ€” What to follow up on
๐Ÿ‘ค Ahmed shezawi
โฑ
Downtime cause concentrated in this team ๐Ÿ”ด High
Elec & Mech โ€” 390 min (100% of plant total)
This team accounts for 100% of all "Elec & Mech" downtime in the plant. Because the other teams do not share it at this level, it is likely a practice or handover issue rather than an equipment fault.
๐Ÿ‘ค
Operator needs support ๐Ÿ”ด High
Ali Humaid Ali Al Maaqbali โ€” 12.1% vs 7.6% expected (+4.6)
Ali Humaid Ali Al Maaqbali runs 4.6 points above the rejection expected for the models they were actually assigned, across 8 runs. Worth a conversation and a look at technique.
๐Ÿ” Full analysis for this person
โœจ
Rejection above plant average ๐ŸŸก Medium
8.4% vs 6.8%
This team rejects 8.4% of output against a plant average of 6.8%. Check mold handling, pouring practice, and NDT feedback loops for this crew.
โฑ
Downtime above plant average ๐ŸŸก Medium
58 min/run
Total 3,325 minutes lost โ€” 58 min per run against a plant average of 48. Review shift start-up routine and how quickly issues get escalated.
๐Ÿ“‰
OEE below plant average ๐ŸŸก Medium
64.5%
Running 5.2 points below the plant. See which of the three components (A / P / Q) is dragging it down.
๐Ÿญ
Underperforming on a shared machine ๐ŸŸก Medium
M/C No. 15 โ€” Rejection % 16.1% vs 8.7% ยท OEE 60% vs 66%
On machine 15 (9 runs) this team rejects 16.1% against 8.7% for other teams on the SAME machine. Same equipment, different result โ€” so the gap points to method, not the machine.
๐Ÿญ
Underperforming on a shared machine ๐ŸŸก Medium
M/C No. 14 โ€” Rejection % 9.7% vs 5.2% ยท OEE 62% vs 66%
On machine 14 (5 runs) this team rejects 9.7% against 5.2% for other teams on the SAME machine. Same equipment, different result โ€” so the gap points to method, not the machine.
๐Ÿ‘ท
Team Operators
Each operator against the rejection expected for the models they actually ran
EmployeeMachine Runs TOTAL PRODUCTIONACTUAL REJECTION EXPECTED REJECTIONDifference Status
Ali Humaid Ali Al Maaqbali 8 569 12.1% 7.6% +4.6 ๐Ÿ”ด High โ€บ
Salim Abdullah Said Al Maqbali 16 1,171 8.3% 6.6% +1.7 โœ“ as expected โ€บ
Abdullah Said Rashid Al Mamari 16 1,044 8.9% 7.5% +1.4 โœ“ as expected โ€บ
Sultan Mohammed Hassan Al Mamari 6 520 6.0% 6.1% -0.1 โœ“ as expected โ€บ
Mohammed Ahmad Khalfan Al Jabri 9 575 6.4% 6.7% -0.3 โœ“ as expected โ€บ
๐Ÿ“‰
Weakest Shifts
Lowest OEE shifts for this team โ€” open one to see the machine detail
DateShiftMachines TOTAL PRODUCTIONRejection % Total DowntimeOEE
2026-07-29 Day 4 215 8.8% 630 26.9% ๐Ÿ”
2026-07-14 Night 2 77 7.8% 50 46.2% ๐Ÿ”
2026-07-12 Day 6 429 12.8% 480 52.8% ๐Ÿ”
2026-07-20 Day 3 178 6.7% 270 57.8% ๐Ÿ”
2026-07-21 Day 6 359 9.2% 60 59.7% ๐Ÿ”
2026-07-23 Night 5 393 9.7% 720 60.2% ๐Ÿ”