๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-05-19
Day โ€” Team B
TOTAL NDT OK
0
Units
TOTAL HC&FC REJECT
0
Units
H&F REJECTION %
0.00%
of total production
NDT REJECTION %
0.00%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-05-19
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
11
Total Absent:
9
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Damaged DieCoat Bottles Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
25.00
โš  Below minimum
-7.90 0.00 32.90 received S.A crucible (13.9ton)
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 35.00 35.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 0 0 0 0 0.0% 0.0% 0.0% โ€”
7 Running CV98-20-M2 0 0 0 0 0.0% 0.0% 0.0% โ€”
8 Running SMX201-22M4 0 0 0 0 0.0% 0.0% 0.0% โ€”
16 Running 640-16" 0 0 0 0 0.0% 0.0% 0.0% โ€”
17 Running SMX201-22-M7 0 0 0 0 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 0 โ€”โ€”โ€”โ€”
TOTAL REJECTION 0 0% 0% 0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
SMX201-22-M6 Completed โ€”
โœ๏ธ Start a New Report