Date & Shift
2026-11-03
Night โ€” Team A
TOTAL NDT OK
109
Units
TOTAL HC&FC REJECT
12
Units
H&F REJECTION %
9.45%
of total production
NDT REJECTION %
4.72%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-11-03
Shift:
Night
Supervisor:
Ahmad
Team:
A
Total Attendance:
17
Total Absent:
2
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
11
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
26.20 23.50 0.00 2.70 โ€”
SWM1 18.50 25.70 0.00 -7.20 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 444-18 4H 7 3 0 10 30.0% 30.0% 0.0% โ€”
7 Stopped 666-17 4H 27 3 1 31 12.9% 9.7% 3.2% โ€”
17 Running 666-18 4H 75 6 5 86 12.8% 7.0% 5.8% โ€”
TOTAL PRODUCTION 127 โ€”โ€”โ€”โ€”
TOTAL REJECTION 18 14.2% 9.4% 4.7% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
444-18 Completed โ€”
333-20 In Progress side and upper molde done
โœ๏ธ Start a New Report