๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-11-01
Night โ€” Team D
TOTAL NDT OK
164
Units
TOTAL HC&FC REJECT
16
Units
H&F REJECTION %
8.29%
of total production
NDT REJECTION %
6.74%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-11-01
Shift:
Night
Supervisor:
Humaid Al Mazroui
Team:
D
Total Attendance:
13
Total Absent:
6
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 After metal poring Meta fill down Closed
2 Some waste cartoon near furnace Closed
3 Housekeeping in casting line Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
19.36
โš  Below minimum
3.70 2.80 18.46 โ€”
SWM1 23.90 0.00 0.00 23.90 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Stopped RPM.444-22 19 4 0 23 17.4% 17.4% 0.0% โ€”
7 Running RPM.222.17 71 6 8 85 16.5% 7.1% 9.4% โ€”
17 Running RPM.777-18 74 6 5 85 12.9% 7.1% 5.9% โ€”
TOTAL PRODUCTION 193 โ€”โ€”โ€”โ€”
TOTAL REJECTION 29 15.0% 8.3% 6.7% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report