๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-09-15
Day โ€” Team A
TOTAL NDT OK
0
Units
TOTAL HC&FC REJECT
0
Units
H&F REJECTION %
0.00%
of total production
NDT REJECTION %
0.00%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-15
Shift:
Day
Supervisor:
Humaid Al Mazroui
Team:
A
Total Attendance:
16
Total Absent:
2
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Rapper Furnace door in casting Closed
2 Tire of pin dross damage Closed
3 Safety wire LPDC14 remove Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
16.73
โš  Below minimum
0.00 8.10 24.83 โ€”
SWM1 34.44 3.20 0.00 31.24 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 โ€” โ€” 0 0 0 0 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 0 โ€”โ€”โ€”โ€”
TOTAL REJECTION 0 0% 0% 0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 2
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R69-17 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

All moulds running in day shift are Trial .

โœ๏ธ Start a New Report