2026-10-24
Night โ€” Team C
TOTAL NDT OK
83
Units
TOTAL HC&FC REJECT
14
Units
H&F REJECTION %
12.17%
of total production
NDT REJECTION %
15.65%
of total production
DOWNTIME (min)
1,080
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-10-24
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
12
Total Absent:
5
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 HA furnace metal leak High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
19.72
โš  Below minimum
2.60 3.38 20.50 all metal leaked . no metal in furnace
HC
min: 24T
21.16
โš  Below minimum
17.72 0.00 3.44 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Stopped R79-20 5 9 13 27 81.5% 33.3% 48.2% trail, mold more rejection mold stopped
7 Standby 777-17 49 3 5 57 14.0% 5.3% 8.8% stopped due to issue in melting
17 Standby 222-17 29 2 0 31 6.5% 6.5% 0.0% stopped due to issue in melting
TOTAL PRODUCTION 115 โ€”โ€”โ€”โ€”
TOTAL REJECTION 32 27.8% 12.2% 15.7% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
sprue drlling 1 720 min no action to be fixed maintance Open โ€”
HA furnace metal leak 360 min stopped , metal empty out to be fixed I'm not sure Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
444-22-5H In Progress โ€”
๐Ÿ“
ADDITIONAL REMARKS

New mold continues rejection ( hub and rim shrinkage ) HA furnace leaked from bottom wall . ALL FOUNDRY OPERATION STOPPED