๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-08
Day โ€” Team B
TOTAL NDT OK
347
Units
TOTAL HC&FC REJECT
26
Units
H&F REJECTION %
6.53%
of total production
NDT REJECTION %
6.28%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-08
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
18
Total Absent:
2
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
184.00 25.82 0.00 158.18 โ€”
SWM1 30.32 23.03 12.80 20.09 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV44 22" 53 5 5 63 15.9% 7.9% 7.9% โ€”
5 Running CV41 22" 68 6 9 83 18.1% 7.2% 10.8% โ€”
6 DCO CA90 22" 40 4 6 50 20.0% 8.0% 12.0% โ€”
6 Running SMX211 24" 2 0 0 2 0.0% 0.0% 0.0% โ€”
14 Running CV40 22" 39 0 0 39 0.0% 0.0% 0.0% โ€”
15 Running 640 17" M2 100 5 4 109 8.3% 4.6% 3.7% Stopped because of more defects DCO (640 17" M1)
16 Running 640 17" M2 45 6 1 52 13.5% 11.5% 1.9% โ€”
TOTAL PRODUCTION 398 โ€”โ€”โ€”โ€”
TOTAL REJECTION 51 12.8% 6.5% 6.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
CV62-24" Not Completed Requires year change...
โœ๏ธ Start a New Report