๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-09
Day โ€” Team A
TOTAL NDT OK
0
Units
TOTAL HC&FC REJECT
0
Units
H&F REJECTION %
0.00%
of total production
NDT REJECTION %
0.00%
of total production
DOWNTIME (min)
45
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-09
Shift:
Day
Supervisor:
Ahmed Ali Mohammed
Team:
A
Total Attendance:
12
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 water leak on laser mark 2 machine Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
25.00 9.60 0.00 15.40 โ€”
SWM1 23.00 0.00 10.60 33.60 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running cv98-20 0 0 0 0 0.0% 0.0% 0.0% โ€”
5 Running cv41-22 0 0 0 0 0.0% 0.0% 0.0% โ€”
6 Running smx201-22 0 0 0 0 0.0% 0.0% 0.0% โ€”
14 Running 640-16" 0 0 0 0 0.0% 0.0% 0.0% โ€”
15 Running 640-17 0 0 0 0 0.0% 0.0% 0.0% โ€”
16 Running 640-16" 0 0 0 0 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 0 โ€”โ€”โ€”โ€”
TOTAL REJECTION 0 0% 0% 0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
forklift d1 ac not working 45 min inform ac compressor need replace maintenance team Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
cv62 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

Maintenance Manager asked to give the forklift for service to check the AC and do the needful to repair it, but it was not done. Also, they could not remove the AC compressor, and this job made 2 machines stop. We were delayed in metal because of this, so I asked them to fix it back, take it back, complete the taping , and restart the machine. Tried to start the 7th machine in casting, but because the ladles are not holding the temperature, we cannot fill them 3 times. At the moment, we can fill them only 2 times. Forklifts are in bad condition. Every day, one forklift breaks down. They need to do a full service properly to avoid daily stoppages. I have spoken with all outsourced workers in the Foundry not to lift any wheels from the Rejection, HC, or FC areas. The operator will do this job. Today and the last 2 days ,It assigned to Sultan so he lifted the wheels for the full day.

โœ๏ธ Start a New Report