Report #103 โ Submitted 2026-08-10 19:07:13
| No | Observation | Status |
|---|---|---|
| โ No observations recorded โ | ||
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
14.40 โ Below minimum
|
11.20 | 11.90 | 15.10 | โ |
| SWM1 | 27.10 | 11.90 | 13.85 | 29.05 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | โ | โ |
| Hand Over | โ | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | CV44-22 | 54 | 6 | 5 | 65 | 16.9% | 9.2% | 7.7% | โ |
| 5 | Running | CA90-22 | 63 | 4 | 0 | 67 | 6.0% | 6.0% | 0.0% | โ |
| 6 | DCO | SMX211-24 | 5 | 2 | 2 | 9 | 44.4% | 22.2% | 22.2% | more visual cavity, old stopped |
| 6 | Running | smx201-22' | 13 | 4 | 4 | 21 | 38.1% | 19.1% | 19.1% | โ |
| 14 | Running | CV62-24 | 36 | 8 | 6 | 50 | 28.0% | 16.0% | 12.0% | โ |
| 15 | Running | 640-17 | 67 | 6 | 5 | 78 | 14.1% | 7.7% | 6.4% | โ |
| TOTAL PRODUCTION | 290 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 52 | 17.9% | 10.3% | 7.6% | โ | |||||
| ๐ฝ Machines Received from Previous Shift: | 6 | ๐ผ Machines Handed Over: | 5 |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| L7 | 540 min | โ | โ | โ | โ | โ | |
| L17 | 720 min | โ | โ | โ | โ | โ |
| Die Model | Status | Remarks |
|---|---|---|
| CV40-22 | Not Completed | upper injection pins are stuck |
| 640-17 | In Progress | need engineering dpt to check, ramesh busy with udit |
| CA91-24 | Completed | โ |
L7-L17 under B.D, more flash in most molds, requiring to remove them and making H.C to continue , this reduce production, de flashing damaged more wheels due to wheel not sitting properly, no backup molds are ready till 5 pm