๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-10
Day โ€” Team B
TOTAL NDT OK
281
Units
TOTAL HC&FC REJECT
29
Units
H&F REJECTION %
8.87%
of total production
NDT REJECTION %
5.20%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-10
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
0
Total Absent:
0
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 3-ton forklift (chips) engine temp problem. High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV44 22" 67 7 2 76 11.8% 9.2% 2.6% โ€”
5 Running CA90 22" 68 5 2 75 9.3% 6.7% 2.7% โ€”
6 Running SMX201 22" M4 6 5 7 18 66.7% 27.8% 38.9% MOLD IN BAD CODITION
14 Running CV62 24" 60 6 5 71 15.5% 8.5% 7.0% โ€”
16 Running 640 17" M2 80 6 1 87 8.1% 6.9% 1.2% โ€”
TOTAL PRODUCTION 327 โ€”โ€”โ€”โ€”
TOTAL REJECTION 46 14.1% 8.9% 5.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
โœ๏ธ Start a New Report