๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-13
Night โ€” Team C
TOTAL NDT OK
234
Units
TOTAL HC&FC REJECT
0
Units
H&F REJECTION %
0.00%
of total production
NDT REJECTION %
10.00%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-13
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
14
Total Absent:
0
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 chips on floor Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
22.50
โš  Below minimum
12.75 10.45 20.20 โ€”
SWM1 30.60 10.45 11.25 31.40 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV40-22 49 0 10 59 17.0% 0.0% 17.0% โ€”
5 Running CA90-22 66 0 2 68 2.9% 0.0% 2.9% โ€”
6 Running CV44-22 39 0 4 43 9.3% 0.0% 9.3% โ€”
7 Running CA91-24 50 0 4 54 7.4% 0.0% 7.4% โ€”
14 Stopped CV62-24 27 0 6 33 18.2% 0.0% 18.2% target over
16 Running 640-15'' 3 0 0 3 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 260 โ€”โ€”โ€”โ€”
TOTAL REJECTION 26 10.0% 0.0% 10.0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-15'' Completed โ€”
640-17 โ€” LOWER MOLD NEED more checking more pitting
๐Ÿ“
ADDITIONAL REMARKS

quenching water not coming from 7 pm till 1 am , hot wheels and delay in feedback

โœ๏ธ Start a New Report