Report #106 โ Submitted 2026-08-15 07:12:32
| No | Observation | Status |
|---|---|---|
| 1 | LPDC 7 water leak beside the furnace | High Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
17,910.00 | 12,090.00 | 11,400.00 | 17,220.00 | โ |
| SWM1 | 34,200.00 | 11,400.00 | 0.00 | 22,800.00 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Good | โ |
| Hand Over | Good | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Stopped | CV40-22 | 20 | 3 | 5 | 28 | 28.6% | 10.7% | 17.9% | โ |
| 5 | Running | CA90-24 | 60 | 6 | 6 | 72 | 16.7% | 8.3% | 8.3% | โ |
| 6 | Running | CV44-22 | 70 | 8 | 2 | 80 | 12.5% | 10.0% | 2.5% | โ |
| 7 | Stopped | SMX201-24 | 8 | 2 | 3 | 13 | 38.5% | 15.4% | 23.1% | โ |
| 14 | Running | 640-17 m2 | 93 | 0 | 3 | 96 | 3.1% | 0.0% | 3.1% | โ |
| 15 | Running | 640-17 m1 | 83 | 10 | 8 | 101 | 17.8% | 9.9% | 7.9% | โ |
| 16 | Running | 640-15 m1 | 95 | 7 | 2 | 104 | 8.7% | 6.7% | 1.9% | โ |
| TOTAL PRODUCTION | 494 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 65 | 13.2% | 7.3% | 5.9% | โ | |||||
| ๐ฝ Machines Received from Previous Shift: | 6 | ๐ผ Machines Handed Over: | 5 |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| Laddel preheat | Trapped | 360 min | Still not solved | NA | Maintenance | Open | โ |
| LPDC7 furnace heater | Damaged | 380 min | Still not solved | NA | Maintenance | Open | โ |
| Die Model | Status | Remarks |
|---|---|---|
| SMX211-24 | Completed | โ |
All operations process going smoothly in save condition, some maintenance issues were facing to X-ray feedback ( laser mark and conveyor)