Night โ€” Team A
TOTAL NDT OK
372
Units
TOTAL HC&FC REJECT
40
Units
H&F REJECTION %
9.17%
of total production
NDT REJECTION %
5.50%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-15
Shift:
Night
Supervisor:
OMAR
Team:
A
Total Attendance:
12
Total Absent:
4
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
20.00
โš  Below minimum
16.22 0.00 3.78 โ€”
SWM1 25.20 26.50 11.00 9.70 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running CV98 20" 61 5 2 68 10.3% 7.4% 2.9% โ€”
5 Running CA90 24" 70 6 1 77 9.1% 7.8% 1.3% โ€”
6 Running CV44 22" 53 5 7 65 18.5% 7.7% 10.8% โ€”
14 Running 640 16" M1 40 10 2 52 23.1% 19.2% 3.9% โ€”
15 Running 640 17" M1 80 7 6 93 14.0% 7.5% 6.5% โ€”
16 Running 640 15" 68 7 6 81 16.1% 8.6% 7.4% โ€”
TOTAL PRODUCTION 436 โ€”โ€”โ€”โ€”
TOTAL REJECTION 64 14.7% 9.2% 5.5% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640 17" M2 Completed โ€”