๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-02
Day โ€” Team A
TOTAL NDT OK
140
Units
TOTAL HC&FC REJECT
15
Units
H&F REJECTION %
9.49%
of total production
NDT REJECTION %
1.90%
of total production
DOWNTIME (min)
440
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-02
Shift:
Day
Supervisor:
Ahmed Ali Mohammed
Team:
A
Total Attendance:
13
Total Absent:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
30.90 2.40 0.00 28.50 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 27.90 4.90 0.00 23.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad need to repair and remove the metal
Hand Over Bad need to repair and remove the metal
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 73 7 0 80 8.8% 8.8% 0.0% โ€”
17 Running smx201-22 m6 67 8 3 78 14.1% 10.3% 3.9% โ€”
TOTAL PRODUCTION 158 โ€”โ€”โ€”โ€”
TOTAL REJECTION 18 11.4% 9.5% 1.9% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
HA burner 1 not working 60 min repair done no maintenance team Closed yes
HA pump tripping not working 200 min repair done no maintenance team Closed yes
SWM2 pump not working not working 180 min repair done no maintenance team Closed yes
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”