๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-16
Night โ€” Team A
TOTAL NDT OK
287
Units
TOTAL HC&FC REJECT
41
Units
H&F REJECTION %
11.85%
of total production
NDT REJECTION %
5.20%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-16
Shift:
Night
Supervisor:
OMAR
Team:
A
Total Attendance:
13
Total Absent:
3
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
19.36
โš  Below minimum
19.86 0.00 -0.50 โ€”
SWM1 29.40 29.64 0.00 -0.24 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640 17 M1 0 4 0 4 100.0% 100.0% 0.0% Starting
5 Running CA90 24" 57 9 2 68 16.2% 13.2% 2.9% โ€”
6 Running CV98 20" 55 5 2 62 11.3% 8.1% 3.2% โ€”
14 Running 640 16" M1 85 8 2 95 10.5% 8.4% 2.1% โ€”
15 Running 640 15" 5H 16 8 3 27 40.7% 29.6% 11.1% โ€”
16 Running 640 17" M2 74 7 9 90 17.8% 7.8% 10.0% โ€”
TOTAL PRODUCTION 346 โ€”โ€”โ€”โ€”
TOTAL REJECTION 59 17.1% 11.8% 5.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640 17" M1 Completed โ€”
640 15" 5H Completed โ€”
โœ๏ธ Start a New Report