Date & Shift
2026-08-17
Day โ€” Team C
TOTAL NDT OK
374
Units
TOTAL HC&FC REJECT
49
Units
H&F REJECTION %
10.27%
of total production
NDT REJECTION %
11.32%
of total production
DOWNTIME (min)
15
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-17
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
14
Total Absent:
5
Was the Lean Meeting conducted?:
No
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 more wheels on ground Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 M1 31 12 11 54 42.6% 22.2% 20.4% โ€”
5 Running CA90-24 49 6 7 62 21.0% 9.7% 11.3% โ€”
6 Running cv98-20 42 7 7 56 25.0% 12.5% 12.5% โ€”
7 Running SMX201-24 62 4 3 69 10.1% 5.8% 4.4% โ€”
14 Running 640-16 71 5 4 80 11.3% 6.3% 5.0% โ€”
15 Running 640-15'' 39 10 18 67 41.8% 14.9% 26.9% โ€”
16 Running 640-17 M2 80 5 4 89 10.1% 5.6% 4.5% โ€”
TOTAL PRODUCTION 477 โ€”โ€”โ€”โ€”
TOTAL REJECTION 103 21.6% 10.3% 11.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 7 ๐Ÿ”ผ Machines Handed Over: 7
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LDPC6 DOOR ISSUE 15 min โ€” โ€” โ€” โ€” โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
CA90-26 Completed โ€”
640-16 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

LASER MARKING AND DEFLASING MACHINE ISSUE , NO CONSIST FEEDBACK HC 22 TON SWM1 25 TON