Report #114 โ Submitted 2026-08-19 07:05:37
| No | Observation | Status |
|---|---|---|
| 1 | water leak under the control room in casting | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
19.43 โ Below minimum
|
14.42 | 17.61 | 22.62 | โ |
| SWM1 | 31.61 | 17.61 | 15.72 | 29.72 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Good | โ |
| Hand Over | Good | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | 640-17" | 80 | 6 | 11 | 97 | 17.5% | 6.2% | 11.3% | โ |
| 5 | Stopped | CA90-24" | 51 | 4 | 0 | 55 | 7.3% | 7.3% | 0.0% | start 02.00 am |
| 6 | Stopped | CV98-20" | 68 | 5 | 1 | 74 | 8.1% | 6.8% | 1.4% | โ |
| 7 | Running | SMX201-24" | 78 | 5 | 1 | 84 | 7.1% | 6.0% | 1.2% | โ |
| 14 | Running | 640-16"-m2 | 101 | 5 | 2 | 108 | 6.5% | 4.6% | 1.9% | โ |
| 15 | Running | 640-15"-5H | 94 | 6 | 1 | 101 | 6.9% | 5.9% | 1.0% | โ |
| 16 | Running | 640-17" | 67 | 4 | 8 | 79 | 15.2% | 5.1% | 10.1% | new mold fix at 6:00 am 640-16" |
| TOTAL PRODUCTION | 598 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 59 | 9.9% | 5.9% | 4.0% | โ | |||||
| ๐ฝ Machines Received from Previous Shift: | 7 | ๐ผ Machines Handed Over: | 6 |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| lpdc 5 | gate shocked | 0 min | โ | yes - change die | opration | Open | โ |
| Die Model | Status | Remarks |
|---|---|---|
| โ No die maintenance recorded โ | ||