๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-19
Night โ€” Team C
TOTAL NDT OK
310
Units
TOTAL HC&FC REJECT
38
Units
H&F REJECTION %
9.92%
of total production
NDT REJECTION %
9.14%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-19
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
15
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
2
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 broken pallet Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received โ€” โ€”
Hand Over โ€” โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 6 0 0 6 0.0% 0.0% 0.0% โ€”
5 Running SMX211-24 13 12 13 38 65.8% 31.6% 34.2% โ€”
6 Running CV93 17 4 3 24 29.2% 16.7% 12.5% โ€”
7 Running SMX201-24 47 5 8 60 21.7% 8.3% 13.3% โ€”
14 Running 640-16 M2 90 5 3 98 8.2% 5.1% 3.1% โ€”
15 Running 640-15'' 69 7 6 82 15.9% 8.5% 7.3% โ€”
16 Running 640-16 68 5 2 75 9.3% 6.7% 2.7% โ€”
TOTAL PRODUCTION 383 โ€”โ€”โ€”โ€”
TOTAL REJECTION 73 19.1% 9.9% 9.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 6 ๐Ÿ”ผ Machines Handed Over: 7
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17'' In Progress โ€”
640-17 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

conveyor issue , laser marking issue , sprue drilling loop conveyor issue

โœ๏ธ Start a New Report