Report #118 โ Submitted 2026-08-21 07:01:51
| No | Observation | Status |
|---|---|---|
| โ No observations recorded โ | ||
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
24.77 | 11.22 | 8.31 | 21.86 | โ |
| SWM1 | 30.10 | 10.20 | 13.70 | 33.60 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Good | HA to SWM2 bad ( metal solidify) |
| Hand Over | Good | HA to SWM2 bad ( metal solidify) |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | 640-17 | 86 | 6 | 0 | 92 | 6.5% | 6.5% | 0.0% | โ |
| 5 | Stopped | โ | 0 | 0 | 0 | 0 | 0.0% | 0.0% | 0.0% | need to adjust the gripper in xray 3 |
| 6 | Running | โ | 49 | 4 | 1 | 54 | 9.3% | 7.4% | 1.9% | โ |
| 7 | Running | โ | 86 | 5 | 3 | 94 | 8.5% | 5.3% | 3.2% | robo gripper issue , fixed |
| 14 | Standby | โ | 25 | 9 | 11 | 45 | 44.4% | 20.0% | 24.4% | need to investgate the raiser tube breaking before starting again as two raiser tube failed |
| 15 | Running | โ | 84 | 6 | 2 | 92 | 8.7% | 6.5% | 2.2% | โ |
| 16 | Running | โ | 60 | 7 | 12 | 79 | 24.1% | 8.9% | 15.2% | unfilling issue |
| TOTAL PRODUCTION | 456 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 66 | 14.5% | 8.1% | 6.4% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| sprue drilling | roller | 320 min | stopped | โ | โ | In Progress | โ |
| Die Model | Status | Remarks |
|---|---|---|
| โ No die maintenance recorded โ | ||