๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-21
Day โ€” Team A
TOTAL NDT OK
452
Units
TOTAL HC&FC REJECT
41
Units
H&F REJECTION %
7.90%
of total production
NDT REJECTION %
5.01%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-21
Shift:
Day
Supervisor:
OMAR
Team:
A
Total Attendance:
11
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 L15 water leaking Low Risk
2 L7 H.F door metal stuck. Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
21.86
โš  Below minimum
8.95 9.60 22.51 โ€”
SWM1 32.60 9.60 10.90 33.90 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640 17" M2 105 5 0 110 4.6% 4.6% 0.0% โ€”
6 Running CV93 22" 63 5 2 70 10.0% 7.1% 2.9% โ€”
7 Running 640 17"M1 95 5 1 101 5.9% 5.0% 1.0% โ€”
14 Running 640 16" M2 61 8 3 72 15.3% 11.1% 4.2% โ€”
15 Running 640 15" 5H 88 8 3 99 11.1% 8.1% 3.0% โ€”
16 Stopped 640 16" M1 40 10 17 67 40.3% 14.9% 25.4% continues reject (S/S)
TOTAL PRODUCTION 519 โ€”โ€”โ€”โ€”
TOTAL REJECTION 67 12.9% 7.9% 5.0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 5 ๐Ÿ”ผ Machines Handed Over: 5
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
SMX211 24" Completed โ€”
SMX201 24" Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

Couldn't start L5 (CA90 26") due to X-ray 03 gripper problem.

โœ๏ธ Start a New Report