๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-03
Day โ€” Team A
TOTAL NDT OK
172
Units
TOTAL HC&FC REJECT
16
Units
H&F REJECTION %
8.29%
of total production
NDT REJECTION %
2.59%
of total production
DOWNTIME (min)
60
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-03
Shift:
Day
Supervisor:
Ahmed Ali Mohammed
Team:
A
Total Attendance:
14
Total Absent:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 conveyer cover not fixed and kept on the Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 23.00 23.00 0.00 0.00 maked as blocks
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad need to repair and remove the metal
Hand Over Bad need to repair and remove the metal
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
7 Running 640-16 47 6 2 55 14.6% 10.9% 3.6% โ€”
16 Running 640-15" 93 4 2 99 6.1% 4.0% 2.0% โ€”
17 Running 6smx201-22-m6 32 6 1 39 18.0% 15.4% 2.6% โ€”
TOTAL PRODUCTION 193 โ€”โ€”โ€”โ€”
TOTAL REJECTION 21 10.9% 8.3% 2.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
HA pump stop not working 60 min repair done no maintenance team โ€” โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

SWM2 empty done HA cleaning done HC preparing done Forklift AC bad condition

โœ๏ธ Start a New Report