Report #12 โ Submitted 2026-06-05 05:52:28
| No | Observation | Status |
|---|---|---|
| 1 | conveyer cover not fixed and kept on the | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| SWM1 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| SWM2 | 23.00 | 23.00 | 0.00 | 0.00 | maked as blocks |
| Stage | Condition | Comments |
|---|---|---|
| Received | Bad | need to repair and remove the metal |
| Hand Over | Bad | need to repair and remove the metal |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 7 | Running | 640-16 | 47 | 6 | 2 | 55 | 14.6% | 10.9% | 3.6% | โ |
| 16 | Running | 640-15" | 93 | 4 | 2 | 99 | 6.1% | 4.0% | 2.0% | โ |
| 17 | Running | 6smx201-22-m6 | 32 | 6 | 1 | 39 | 18.0% | 15.4% | 2.6% | โ |
| TOTAL PRODUCTION | 193 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 21 | 10.9% | 8.3% | 2.6% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| HA pump stop | not working | 60 min | repair done | no | maintenance team | โ | โ |
| Die Model | Status | Remarks |
|---|---|---|
| โ No die maintenance recorded โ | ||
SWM2 empty done HA cleaning done HC preparing done Forklift AC bad condition