๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-23
Day โ€” Team B
TOTAL NDT OK
252
Units
TOTAL HC&FC REJECT
31
Units
H&F REJECTION %
9.87%
of total production
NDT REJECTION %
9.87%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-23
Shift:
Day
Supervisor:
Mohammed AL roshdi
Team:
B
Total Attendance:
11
Total Absent:
9
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
19.10
โš  Below minimum
19.10 0.00 0.00 โ€”
SWM1 33.30 34.40 0.00 -1.10 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped 640-17 m2 25 2 3 30 16.7% 6.7% 10.0% โ€”
5 Running CA90-26 47 6 9 62 24.2% 9.7% 14.5% โ€”
6 Running SMX201-24 m1 21 7 6 34 38.2% 20.6% 17.7% โ€”
7 Running 640-17 m1 52 6 6 64 18.8% 9.4% 9.4% โ€”
14 Running 640-16 m2 91 5 2 98 7.1% 5.1% 2.0% โ€”
15 Stopped 640-15 16 5 5 26 38.5% 19.2% 19.2% โ€”
TOTAL PRODUCTION 314 โ€”โ€”โ€”โ€”
TOTAL REJECTION 62 19.7% 9.9% 9.9% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-16 m1 In Progress โ€”