GENERAL INFORMATION
Date:
2026-08-25
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
16
Total Absent:
2
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 dross block on ground Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
21.23
โš  Below minimum
9.40 11.00 22.83 โ€”
SWM1 32.90 11.00 12.60 34.50 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 95 4 0 99 4.0% 4.0% 0.0% โ€”
5 Running SMX211-24 8 6 4 18 55.6% 33.3% 22.2% โ€”
6 Running SMX201-24 58 5 4 67 13.4% 7.5% 6.0% โ€”
7 Running 640-17 78 6 7 91 14.3% 6.6% 7.7% โ€”
14 Running 640-16 67 7 1 75 10.7% 9.3% 1.3% โ€”
TOTAL PRODUCTION 350 โ€”โ€”โ€”โ€”
TOTAL REJECTION 44 12.6% 8.0% 4.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
lpdc14 heater 120 min repaired โ€” โ€” Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
cv40-22 Completed โ€”
R62-18 Completed โ€”