๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-26
Day โ€” Team C
TOTAL NDT OK
258
Units
TOTAL HC&FC REJECT
21
Units
H&F REJECTION %
6.67%
of total production
NDT REJECTION %
11.43%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-26
Shift:
Day
Supervisor:
Al Julanda
Team:
C
Total Attendance:
12
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
18.00
โš  Below minimum
8.43 10.13 19.70 โ€”
SWM1 34.40 10.13 9.78 34.05 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 93 4 1 98 5.1% 4.1% 1.0% โ€”
5 Running SMX211-24 31 6 13 50 38.0% 12.0% 26.0% โ€”
6 Running SMX201-24 14 2 8 24 41.7% 8.3% 33.3% target over
7 DCO 640-17 0 0 0 0 0.0% 0.0% 0.0% โ€”
14 Running 640-16 78 5 4 87 10.3% 5.8% 4.6% โ€”
16 Stopped RS5 42 4 10 56 25.0% 7.1% 17.9% target over
TOTAL PRODUCTION 315 โ€”โ€”โ€”โ€”
TOTAL REJECTION 57 18.1% 6.7% 11.4% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 4 ๐Ÿ”ผ Machines Handed Over: 3
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17'' M1 Completed โ€”
๐Ÿ“
ADDITIONAL REMARKS

640-17 m1 in oven 5;30 Pm

โœ๏ธ Start a New Report