Report #13 โ Submitted 2026-06-05 06:26:38
| No | Observation | Status |
|---|---|---|
| 1 | water bottles in melting area | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
23.30 โ Below minimum
|
-5.20 | 0.00 | 28.50 | pump having issue ( jammed ) and not working |
| HC
min: 24T
|
0.00 | 0.00 | 0.00 | 0.00 | start up done at 8:30PM |
| SWM1 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | running need to clean and shutdown |
| Stage | Condition | Comments |
|---|---|---|
| Received | Bad | need to repair and remove the metal |
| Hand Over | Bad | need to repair and remove the metal |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 6 | Stopped | 640-17" | 20 | 2 | 1 | 23 | 13.0% | 8.7% | 4.4% | no metal Die stop |
| 7 | Stopped | 640-16" | 21 | 4 | 0 | 25 | 16.0% | 16.0% | 0.0% | no metal Die stop |
| 16 | Stopped | 640-15" | 29 | 0 | 1 | 30 | 3.3% | 0.0% | 3.3% | no metal Die stop |
| TOTAL PRODUCTION | 78 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 8 | 10.3% | 7.7% | 2.6% | โ | |||||
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| forklift d1 | ac not working | 60 min | informed maintenance | need repair | maintenance team | โ | โ |
| fork lift d2 | ac not working | 0 min | informed maintenance | need repair | maintenance team | โ | โ |
| HA pump | not working - jammed | 720 min | informed maintenance -need to remove and do granding | need service | Operation team +maintenance team | โ | yes |
| Die Model | Status | Remarks |
|---|---|---|
| โ No die maintenance recorded โ | ||
1-HC start and on stage 2 from 150 C to 450 C 2-fork lift ac not working at all employees not able to drive with metal transfer all the hot temp come from engine and ladle also the work environment after that deviation taken from Mr.Ram to open window and drive . 3-from the last 3 days HA pump getting issues and tripping all the time need to check once and for all by maintains to avoid metal delays and production stop