๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-27
Night โ€” Team C
TOTAL NDT OK
355
Units
TOTAL HC&FC REJECT
22
Units
H&F REJECTION %
5.73%
of total production
NDT REJECTION %
1.82%
of total production
DOWNTIME (min)
30
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-27
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
12
Total Absent:
7
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 no light outside casting ( casting street) Low Risk
2 celling missing on casting toilte Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
30.15 6.75 0.00 23.40 โ€”
SWM1 25.10 0.00 9.00 34.10 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Stopped โ€” 100 4 0 104 3.9% 3.9% 0.0% viusal deffects
6 Running โ€” 31 4 1 36 13.9% 11.1% 2.8% โ€”
7 Running โ€” 90 7 3 100 10.0% 7.0% 3.0% โ€”
14 Running โ€” 97 5 0 102 4.9% 4.9% 0.0% โ€”
16 Stopped โ€” 37 2 3 42 11.9% 4.8% 7.1% target over
TOTAL PRODUCTION 384 โ€”โ€”โ€”โ€”
TOTAL REJECTION 29 7.6% 5.7% 1.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 4 ๐Ÿ”ผ Machines Handed Over: 3
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LDPC14 ram movement 30 min repaired โ€” โ€” Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R62 โ€” โ€”
rs5-19 โ€” โ€”
โœ๏ธ Start a New Report