Report #135 โ Submitted 2026-08-29 19:19:34
| No | Observation | Status |
|---|---|---|
| 1 | โ5s not good in D.M | Closed |
| 2 | Pipe on the Exit door in casting line | Closed |
| 3 | Ladle of metal is very full | Low Risk |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
17.20 โ Below minimum
|
6.26 | 7.31 | 18.25 | โ |
| SWM1 | 34.40 | 7.31 | 4.10 | 31.19 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Acceptable | โ |
| Hand Over | Acceptable | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | 640-17 M2 | 106 | 5 | 0 | 111 | 4.5% | 4.5% | 0.0% | โ |
| 6 | Breakdown | 640-15 M1 | 64 | 6 | 4 | 74 | 13.5% | 8.1% | 5.4% | โ |
| 7 | Breakdown | 640-17 M1 | 66 | 4 | 4 | 74 | 10.8% | 5.4% | 5.4% | โ |
| 14 | Running | 640-16 M2 | 100 | 5 | 0 | 105 | 4.8% | 4.8% | 0.0% | โ |
| TOTAL PRODUCTION | 364 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 28 | 7.7% | 5.5% | 2.2% | โ | |||||
| ๐ฝ Machines Received from Previous Shift: | 2 | ๐ผ Machines Handed Over: | 1 |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| 6 | Cut off | 60 min | Stop | Maintenance work in progress | Solve fast | In Progress | โ |
| 7 | Heater problem | 120 min | Stop and replace | Maintenance work in progress | Stop | Closed | โ |
| Die Model | Status | Remarks |
|---|---|---|
| 640-16m1 | Completed | โ |