Date & Shift
2026-08-30
Night โ€” Team D
TOTAL NDT OK
375
Units
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
6.59%
of total production
NDT REJECTION %
1.95%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-30
Shift:
Night
Supervisor:
Ali
Team:
D
Total Attendance:
13
Total Absent:
5
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
8
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 SWM1 furnace front more waste Low Risk
2 HT housekeeping done Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
18.25
โš  Below minimum
7.34 14.25 25.16 โ€”
SWM1 31.00 14.25 12.10 28.85 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 105 5 1 111 5.4% 4.5% 0.9% โ€”
6 Running 640-16 69 7 2 78 11.5% 9.0% 2.6% โ€”
7 Running 640-17 99 7 1 107 7.5% 6.5% 0.9% โ€”
14 Running 640-16 102 8 4 114 10.5% 7.0% 3.5% โ€”
TOTAL PRODUCTION 410 โ€”โ€”โ€”โ€”
TOTAL REJECTION 35 8.5% 6.6% 2.0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 4
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-15 Completed โ€”