2026-08-30
Day โ€” Team A
TOTAL NDT OK
252
Units
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
8.74%
of total production
NDT REJECTION %
9.71%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-30
Shift:
Day
Supervisor:
Humaid Al Mazroui
Team:
A
Total Attendance:
12
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Wire safety removed in lpdc 6 Closed
2 Water pipe cooling is leaking Closed
3 5s no good in sprou drill Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
25.91 5.48 4.74 25.17 โ€”
SWM1 30.15 4.71 9.00 34.44 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 M2 95 5 2 102 6.9% 4.9% 2.0% โ€”
6 Stopped 640-16 m1 18 9 13 40 55.0% 22.5% 32.5% โ€”
7 Stopped 640-17 M1 39 8 13 60 35.0% 13.3% 21.7% โ€”
14 Running 640-16 M2 100 5 2 107 6.5% 4.7% 1.9% โ€”
TOTAL PRODUCTION 309 โ€”โ€”โ€”โ€”
TOTAL REJECTION 57 18.4% 8.7% 9.7% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 4 ๐Ÿ”ผ Machines Handed Over: 2
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
Mam RS5 18 Completed โ€”
CA 90 22 In Progress โ€”
๐Ÿ“
ADDITIONAL REMARKS

Reasons of rejection feedback is very late from QC No QC inspector