๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-08-31
Night โ€” Team D
TOTAL NDT OK
302
Units
TOTAL HC&FC REJECT
23
Units
H&F REJECTION %
6.82%
of total production
NDT REJECTION %
3.56%
of total production
DOWNTIME (min)
840
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-08-31
Shift:
Night
Supervisor:
Ali
Team:
D
Total Attendance:
12
Total Absent:
6
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
7
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 EOT Crane Some parts are not stable High Risk
2 Carton sheets kept in front of SWM 1 Medium Risk
3 Manhole between melting and casting broken Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
25.24 6.13 6.35 25.46 โ€”
SWM1 34.60 6.35 8.12 36.37 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 97 5 1 103 5.8% 4.9% 1.0% โ€”
6 Running 640-15 80 6 4 90 11.1% 6.7% 4.4% โ€”
7 Running 640-17 25 6 0 31 19.4% 19.4% 0.0% โ€”
14 Running 640-16 100 6 7 113 11.5% 5.3% 6.2% โ€”
TOTAL PRODUCTION 337 โ€”โ€”โ€”โ€”
TOTAL REJECTION 35 10.4% 6.8% 3.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 4
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
Casting EOT Crane Some parts unstable 720 min Reported to maintenance TBD Maintenance Open HIGH RISK
DG 1 Argon Gas Leak 120 min Solved NA Maintenance Closed Done
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17 Completed Overall Maintenance done ceramic of SM changed
๐Ÿ“
ADDITIONAL REMARKS

Conveyors stopped frequently due to belts damage

โœ๏ธ Start a New Report