๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-09-02
Night โ€” Team B
TOTAL NDT OK
257
Units
TOTAL HC&FC REJECT
16
Units
H&F REJECTION %
5.80%
of total production
NDT REJECTION %
1.09%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-02
Shift:
Night
Supervisor:
Mohammed alroshdi
Team:
B
Total Attendance:
19
Total Absent:
2
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
21.20
โš  Below minimum
15.50 0.00 5.70 โ€”
SWM1 30.70 34.40 0.00 -3.70 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 m2 76 6 0 82 7.3% 7.3% 0.0% โ€”
6 Running 640-15 4H 95 4 3 102 6.9% 3.9% 2.9% โ€”
14 Running 640-17 m1 80 6 0 86 7.0% 7.0% 0.0% โ€”
14 Stopped 640-16 m2 6 0 0 6 0.0% 0.0% 0.0% โ€”
TOTAL PRODUCTION 276 โ€”โ€”โ€”โ€”
TOTAL REJECTION 19 6.9% 5.8% 1.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”