๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-09-07
Day โ€” Team A
TOTAL NDT OK
110
Units
TOTAL HC&FC REJECT
13
Units
H&F REJECTION %
9.03%
of total production
NDT REJECTION %
14.58%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-07
Shift:
Day
Supervisor:
Humaid Al Mazroui
Team:
A
Total Attendance:
16
Total Absent:
3
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 General waste not removed Closed
2 LPDC 14 not clean more waste like lupix , dicot Closed
3 Safety wire removed from LPDC 6 Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
28.79 2.60 0.00 26.19 โ€”
SWM1 25.70 0.00 8.10 33.80 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Stopped 640-15 m1 24 6 10 40 40.0% 15.0% 25.0% โ€”
16 Running 640-16 m2 86 7 11 104 17.3% 6.7% 10.6% โ€”
TOTAL PRODUCTION 144 โ€”โ€”โ€”โ€”
TOTAL REJECTION 34 23.6% 9.0% 14.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 1
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17 Completed โ€”
R69 -17 Completed โ€”