Date & Shift
2026-09-08
Night โ€” Team A
TOTAL NDT OK
200
Units
TOTAL HC&FC REJECT
10
Units
H&F REJECTION %
4.63%
of total production
NDT REJECTION %
2.78%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-08
Shift:
Night
Supervisor:
Humaid Al Mazroui
Team:
A
Total Attendance:
15
Total Absent:
2
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Safety sing in HA Furnace Closed
2 5s in casting line Closed
3 Place all the cooling pips in an orderly manner Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
27.20 6.50 0.00 20.70 โ€”
SWM1 27.00 0.00 8.00 35.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 M1 100 5 4 109 8.3% 4.6% 3.7% โ€”
6 Running 640-17 M2 100 5 2 107 6.5% 4.7% 1.9% โ€”
TOTAL PRODUCTION 216 โ€”โ€”โ€”โ€”
TOTAL REJECTION 16 7.4% 4.6% 2.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 2
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
BORO Completed โ€”