Report #155 โ Submitted 2026-09-10 06:49:32
| No | Observation | Status |
|---|---|---|
| 1 | Pallet is damaged in casting no good for loading wheel | Closed |
| 2 | Sprou drill no good clean area | Closed |
| 3 | HT waste is more | Closed |
| Furnace | Mass Received (Ton) | Consumed (Ton) | Metal Added (Ton) | Mass End of Shift (Ton) | Remarks |
|---|---|---|---|---|---|
| HA
min: 28T
|
0.00 | 0.00 | 0.00 | 0.00 | โ |
| HC
min: 24T
|
30.50 | 6.00 | 0.00 | 24.50 | โ |
| SWM1 | 24.00 | 0.00 | 7.60 | 31.60 | โ |
| SWM2 | 0.00 | 0.00 | 0.00 | 0.00 | โ |
| Stage | Condition | Comments |
|---|---|---|
| Received | Acceptable | โ |
| Hand Over | Acceptable | โ |
| M/C No. | Status | Mold Type | NDT OK | HC & FC Reject | NDT Reject | Total | Rejection % | H&F Rej % | NDT Rej % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 4 | Running | 640-17 m1 | 98 | 6 | 3 | 107 | 8.4% | 5.6% | 2.8% | โ |
| 6 | Running | 640-17 m2 | 107 | 4 | 2 | 113 | 5.3% | 3.5% | 1.8% | โ |
| TOTAL PRODUCTION | 220 | โ | โ | โ | โ | |||||
| TOTAL REJECTION | 15 | 6.8% | 4.5% | 2.3% | โ | |||||
| ๐ฝ Machines Received from Previous Shift: | 2 | ๐ผ Machines Handed Over: | 2 |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
|---|---|---|---|---|---|---|---|
| โ No breakdowns recorded โ | |||||||
| Die Model | Status | Remarks |
|---|---|---|
| R69-18 (ET40-57) | Completed | โ |