Date & Shift
2026-09-09
Night โ€” Team A
TOTAL NDT OK
205
Units
TOTAL HC&FC REJECT
10
Units
H&F REJECTION %
4.55%
of total production
NDT REJECTION %
2.27%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-09
Shift:
Night
Supervisor:
Humaid Al Mazroui
Team:
A
Total Attendance:
13
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
6
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Pallet is damaged in casting no good for loading wheel Closed
2 Sprou drill no good clean area Closed
3 HT waste is more Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
30.50 6.00 0.00 24.50 โ€”
SWM1 24.00 0.00 7.60 31.60 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable โ€”
Hand Over Acceptable โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-17 m1 98 6 3 107 8.4% 5.6% 2.8% โ€”
6 Running 640-17 m2 107 4 2 113 5.3% 3.5% 1.8% โ€”
TOTAL PRODUCTION 220 โ€”โ€”โ€”โ€”
TOTAL REJECTION 15 6.8% 4.5% 2.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 2 ๐Ÿ”ผ Machines Handed Over: 2
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R69-18 (ET40-57) Completed โ€”