๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-09-14
Night โ€” Team D
TOTAL NDT OK
99
Units
TOTAL HC&FC REJECT
14
Units
H&F REJECTION %
9.21%
of total production
NDT REJECTION %
25.66%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-09-14
Shift:
Night
Supervisor:
Ali
Team:
D
Total Attendance:
14
Total Absent:
4
Was the Lean Meeting conducted?:
Yes
How many attended the lean meeting:
7
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Wall Fall in Chips Yard High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
21.60
โš  Below minimum
4.90 0.00 16.70 โ€”
SWM1 25.00 0.00 9.00 34.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running R62-17" 60 5 12 77 22.1% 6.5% 15.6% Trail
6 Stopped GMAX-17"-07 4 5 26 35 88.6% 14.3% 74.3% Trail
14 Running 222-18" 35 4 1 40 12.5% 10.0% 2.5% โ€”
TOTAL PRODUCTION 152 โ€”โ€”โ€”โ€”
TOTAL REJECTION 53 34.9% 9.2% 25.7% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
๐Ÿ”ฝ Machines Received from Previous Shift: 1 ๐Ÿ”ผ Machines Handed Over: 2
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
โ€” No die maintenance recorded โ€”
๐Ÿ“
ADDITIONAL REMARKS

HT underbreak down