Date & Shift
2026-06-05
Night โ€” Team A
TOTAL NDT OK
264
Units
TOTAL HC&FC REJECT
13
Units
H&F REJECTION %
4.55%
of total production
NDT REJECTION %
3.15%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-05
Shift:
Night
Supervisor:
Ahmed Ali
Team:
A
Total Attendance:
0
Total Absent:
0
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 wooding pallets in front of HA furnace Low Risk
2 dross not kept in the bin its dumped in ground Low Risk
3 working on the pump in melting may lead to serious issue High Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
27.50
โš  Below minimum
2.70 0.00 24.80 level sonsor showing error we count (mass received + reject wheels add ) - ( ladles mass )
HC
min: 24T
0.00 0.00 0.00 0.00 its retched the 750 C but the door error make errors and drop the temp
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet
Hand Over Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640 - 17" 84 4 4 92 8.7% 4.4% 4.4% โ€”
7 Running 640-16" 82 6 5 93 11.8% 6.5% 5.4% โ€”
16 Running 640-15" 98 3 0 101 3.0% 3.0% 0.0% โ€”
TOTAL PRODUCTION 286 โ€”โ€”โ€”โ€”
TOTAL REJECTION 22 7.7% 4.5% 3.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
713-20 m1 / cv99-20m1 / cv93-22m1 / smx211-22m2 Completed re-service all have been kept out side and last rain effected and start get rest so clean +oil done
๐Ÿ“
ADDITIONAL REMARKS

*HA pump having issue today stopped 3 times and hardly we transfer metal *HC from 450 C to 750 C not able to complete 2 time i found it showing door open and temp get low *if we can adjust the starter motor for the cars to make it rotate the pump it will save time for the melting operator to make the pump release from the jammed also will reduce risk for the operator * good feed back from the fork lift drivers AC is to good .