๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-05-19
Day โ€” Team B
TOTAL NDT OK
319
Units
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
7.24%
of total production
NDT REJECTION %
7.24%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-05-19
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
11
Total Absent:
9
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 DieCoat Bottles Damaged Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
25.00
โš  Below minimum
-8.00 0.00 33.00 received S.A crucible (13.9ton)
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 35.00 5.00 0.00 30.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 76 6 5 87 12.6% 6.9% 5.8% โ€”
7 Running CV98-20-M2 65 4 2 71 8.5% 5.6% 2.8% โ€”
8 Running SMX201-22M4 60 7 9 76 21.1% 9.2% 11.8% โ€”
16 Running 640-16" 85 4 1 90 5.6% 4.4% 1.1% โ€”
17 Running SMX201-22-M7 33 6 10 49 32.7% 12.2% 20.4% โ€”
TOTAL PRODUCTION 373 โ€”โ€”โ€”โ€”
TOTAL REJECTION 54 14.5% 7.2% 7.2% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
โ€” No breakdowns recorded โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
SMX201-22-M6 Completed โ€”
โœ๏ธ Start a New Report