๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-08
Day โ€” Team D
TOTAL NDT OK
69
Units
TOTAL HC&FC REJECT
2
Units
H&F REJECTION %
2.60%
of total production
NDT REJECTION %
7.79%
of total production
DOWNTIME (min)
630
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-08
Shift:
Day
Supervisor:
ALi Nasser
Team:
D
Total Attendance:
16
Total Absent:
4
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 Workplace not organized in casting Low Risk
2 More Heat Stress for workers in DM Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
17.00
โš  Below minimum
-1.00 0.00 18.00 Shift start no metal and temp low after adding metal
HC
min: 24T
10.00
โš  Below minimum
-16.21 0.00 26.21 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 BD
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Stopped SMX201-22"-M7 10 1 4 15 33.3% 6.7% 26.7% Die Stooped due to low metal temp
7 Stopped 640-16" 24 0 1 25 4.0% 0.0% 4.0% Die Stooped due to low metal temp
16 Stopped 640-15" 6 0 1 7 14.3% 0.0% 14.3% Die Stooped due to low metal temp
17 Stopped SMX201-22"-M4 17 1 0 18 5.6% 5.6% 0.0% Die Stooped due to low metal temp
18 Stopped CV98-20"-M2 12 0 0 12 0.0% 0.0% 0.0% Die Stooped due to low metal temp
TOTAL PRODUCTION 77 โ€”โ€”โ€”โ€”
TOTAL REJECTION 8 10.4% 2.6% 7.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LPDC17 Ram Movement 630 min Reported NA Maintenance Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17" Completed โ€”
โœ๏ธ Start a New Report