๐ Recent Shifts โ quick switch
Date & Shift
2026-06-16
Day โ Team D
TOTAL HC&FC REJECT
39
Units
H&F REJECTION %
14.50%
of total production
NDT REJECTION %
7.43%
of total production
| No | Observation | Status |
| 1 |
Oil Leak from Forklift |
Low Risk |
| 2 |
Forklift driver in melting too much heat stress |
High Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
17.71 โ Below minimum
|
-14.07 |
0.00 |
31.78 |
โ |
| HC
min: 24T
|
29.48 |
6.30 |
0.00 |
23.18 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Acceptable |
Still to SWM 2 not ok but to HC OK |
| Hand Over |
Acceptable |
Still to SWM 2 not ok but to HC OK |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Running |
R69.ET40.57 |
80 |
4 |
3 |
87 |
8.1% |
4.6% |
3.5% |
โ |
| 7 |
Running |
640-16" |
37 |
20 |
12 |
69 |
46.4% |
29.0% |
17.4% |
โ |
| 15 |
Running |
640-15" |
25 |
5 |
5 |
35 |
28.6% |
14.3% |
14.3% |
โ |
| 16 |
Running |
R62.ET35.42 |
68 |
10 |
0 |
78 |
12.8% |
12.8% |
0.0% |
โ |
| TOTAL PRODUCTION |
269 |
โ | โ | โ | โ |
| TOTAL REJECTION |
59 |
21.9% |
14.5% |
7.4% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| Robot 8 |
relese signal not working |
90 min |
Solved |
NA |
Maintenance |
Closed |
โ |
| Deflashing #2 |
Not running |
120 min |
Solved |
NA |
Maintenance |
Closed |
โ |
| Die Model | Status | Remarks |
| SMX201-22" |
Completed |
โ |
| R71-20" |
Completed |
โ |