๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-05-20
Night โ€” Team A
TOTAL NDT OK
251
Units
TOTAL HC&FC REJECT
36
Units
H&F REJECTION %
11.18%
of total production
NDT REJECTION %
10.87%
of total production
DOWNTIME (min)
130
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-05-20
Shift:
Night
Supervisor:
Ahmed Ali Mohammed
Team:
A
Total Attendance:
13
Total Absent:
3
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
0.00 0.00 0.00 0.00 โ€”
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 -36.40 0.00 36.40 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Acceptable All covers are bad condition and some of it not available
Hand Over Acceptable All covers are bad condition and some of it not available
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 77 8 9 94 18.1% 8.5% 9.6% โ€”
7 Standby 000 0 0 0 0 0.0% 0.0% 0.0% โ€”
8 Running smx201-22 m4 40 6 10 56 28.6% 10.7% 17.9% more wheels reject from laser mark not done and show as reject
16 Running 640-16 94 5 2 101 6.9% 5.0% 2.0% โ€”
17 Running smx201-22 m7 20 9 11 40 50.0% 22.5% 27.5% aout but very low
18 Breakdown smx201-22 m6 20 8 3 31 35.5% 25.8% 9.7% brack down
TOTAL PRODUCTION 322 โ€”โ€”โ€”โ€”
TOTAL REJECTION 71 22.0% 11.2% 10.9% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
de flashing 2 de flashing not working 30 min repair done add in odo ahmed ali In Progress 00
de flashing 1 gripers not moving 0 min need spair parts not available add in odoo Ahmed Ali In Progress 00
convayer in casting convayer not working 30 min repair done add in odoo Ahmed Ali In Progress 00
lpdc 18 lpdc 18 oven door not opening 70 min need to change caple add in odoo Ahmed Ali In Progress 00
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
ca90 - 22 Completed complete
cv98-20 M2 In Progress upper mold + side mold done - lower mold need to complete
๐Ÿ“
ADDITIONAL REMARKS

mold Backup 1-cv98-22 "M5 2- 640-15" 3- cv44 - 22" 4-TKG9L - 19" 5- CA90 - 22" 1- the manual thermometer in degassing sometime not working 2- SWM2 wight sensor need to check the numbers change ( metal transfer done from HA to SWM2 after time the numbers keep increasing not stop we stop At 35 after that its keep going till it come 36.4 ) so need to check and conform if its ok or not 3- laser mark not able to locate the valve to make the marks so its sending the wheels as reject almost 25 wheels after 2 time send to laser mark need to check if any issue cues this issue 4- maintenance reaction to low also the job need to be done and every time we ask electriton say mechanical job also on other side also with mechanics in CNC and need time . 5-no any change in toilets in casting office area

โœ๏ธ Start a New Report