๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-16
Night โ€” Team C
TOTAL NDT OK
354
Units
TOTAL HC&FC REJECT
23
Units
H&F REJECTION %
5.74%
of total production
NDT REJECTION %
5.99%
of total production
DOWNTIME (min)
1,560
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-16
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
19
Total Absent:
1
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 water leak under laser marking 2 31 Medium Risk
2 air leak in S.D area Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
31.78 10.03 0.00 21.75 4.46 Ton rej wheel charged
HC
min: 24T
23.18
โš  Below minimum
-4.31 0.00 27.49 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad HA to SWM2 bad ( metal solidify)
Hand Over Bad HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running R69-18 90 5 4 99 9.1% 5.1% 4.0% โ€”
7 Stopped 640-17 61 3 8 72 15.3% 4.2% 11.1% โ€”
14 Running boro 18 6 8 32 43.8% 18.8% 25.0% โ€”
15 Running 640-15 85 5 1 91 6.6% 5.5% 1.1% โ€”
16 Running R62-18 100 4 3 107 6.5% 3.7% 2.8% โ€”
TOTAL PRODUCTION 401 โ€”โ€”โ€”โ€”
TOTAL REJECTION 47 11.7% 5.7% 6.0% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LDPC8 ram movement 720 min โ€” to be fixed โ€” Open โ€”
LDPC17 ram movement 720 min โ€” to be fixed โ€” Open โ€”
lpdc4 furnace door not opening 120 min โ€” to be fixed โ€” Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-16'' Completed โ€”
640-17 In Progress need engineering department to check ( new mold)