๐ Recent Shifts โ quick switch
Date & Shift
2026-06-16
Night โ Team C
TOTAL HC&FC REJECT
23
Units
H&F REJECTION %
5.74%
of total production
NDT REJECTION %
5.99%
of total production
| No | Observation | Status |
| 1 |
water leak under laser marking 2 31 |
Medium Risk |
| 2 |
air leak in S.D area |
Low Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
31.78 |
10.03 |
0.00 |
21.75 |
4.46 Ton rej wheel charged |
| HC
min: 24T
|
23.18 โ Below minimum
|
-4.31 |
0.00 |
27.49 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Bad |
HA to SWM2 bad ( metal solidify) |
| Hand Over |
Bad |
HA to SWM2 bad ( metal solidify) |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Running |
R69-18 |
90 |
5 |
4 |
99 |
9.1% |
5.1% |
4.0% |
โ |
| 7 |
Stopped |
640-17 |
61 |
3 |
8 |
72 |
15.3% |
4.2% |
11.1% |
โ |
| 14 |
Running |
boro |
18 |
6 |
8 |
32 |
43.8% |
18.8% |
25.0% |
โ |
| 15 |
Running |
640-15 |
85 |
5 |
1 |
91 |
6.6% |
5.5% |
1.1% |
โ |
| 16 |
Running |
R62-18 |
100 |
4 |
3 |
107 |
6.5% |
3.7% |
2.8% |
โ |
| TOTAL PRODUCTION |
401 |
โ | โ | โ | โ |
| TOTAL REJECTION |
47 |
11.7% |
5.7% |
6.0% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| LDPC8 |
ram movement |
720 min |
โ |
to be fixed |
โ |
Open |
โ |
| LDPC17 |
ram movement |
720 min |
โ |
to be fixed |
โ |
Open |
โ |
| lpdc4 |
furnace door not opening |
120 min |
โ |
to be fixed |
โ |
Open |
โ |
| Die Model | Status | Remarks |
| 640-16'' |
Completed |
โ |
| 640-17 |
In Progress |
need engineering department to check ( new mold) |