๐ Recent Shifts โ quick switch
Date & Shift
2026-06-17
Day โ Team D
TOTAL HC&FC REJECT
45
Units
H&F REJECTION %
10.82%
of total production
NDT REJECTION %
6.25%
of total production
| No | Observation | Status |
| 1 |
Damaged safety cable in LPDC 4 |
Medium Risk |
| 2 |
Operator helmet damaged |
Low Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
21.75 โ Below minimum
|
-11.00 |
0.00 |
32.75 |
added 11 ton rej wheels |
| HC
min: 24T
|
27.49 |
9.39 |
0.00 |
18.10 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Acceptable |
Still to SWM 2 not ok but to HC OK |
| Hand Over |
Acceptable |
Still to SWM 2 not ok but to HC OK |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 4 |
Running |
640-16" |
10 |
3 |
0 |
13 |
23.1% |
23.1% |
0.0% |
Started 4:30 |
| 6 |
Running |
R69.ET40.57 |
90 |
8 |
2 |
100 |
10.0% |
8.0% |
2.0% |
โ |
| 7 |
Running |
640-17" |
12 |
6 |
5 |
23 |
47.8% |
26.1% |
21.7% |
Started 2 PM |
| 14 |
Running |
BORO112 |
45 |
13 |
12 |
70 |
35.7% |
18.6% |
17.1% |
โ |
| 15 |
Running |
640-15" |
90 |
8 |
3 |
101 |
10.9% |
7.9% |
3.0% |
โ |
| 16 |
Running |
R62.ET35.42 |
98 |
7 |
4 |
109 |
10.1% |
6.4% |
3.7% |
โ |
| TOTAL PRODUCTION |
416 |
โ | โ | โ | โ |
| TOTAL REJECTION |
71 |
17.1% |
10.8% |
6.3% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| LPDC 4 |
Frnce door signa |
420 min |
Solved |
NA |
Maintenance |
Closed |
โ |
| DM water |
Not running |
65 min |
Solved |
NA |
Maintenance |
Closed |
โ |
| LPDC17 |
Hydrulic ram issue |
720 min |
NA |
NA |
Maintenance |
Open |
still not rectify safety concern |
| Die Model | Status | Remarks |
| 640-16" |
Completed |
โ |
| 640-17" |
Completed |
โ |