๐ Recent Shifts โ quick switch
Date & Shift
2026-06-17
Night โ Team C
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
6.25%
of total production
NDT REJECTION %
5.79%
of total production
| No | Observation | Status |
| 1 |
forklift without deisal |
Low Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
32.75 |
2.05 |
0.00 |
30.70 |
โ |
| HC
min: 24T
|
18.13 โ Below minimum
|
-4.84 |
0.00 |
22.97 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Bad |
HA to SWM2 bad ( metal solidify) |
| Hand Over |
Bad |
HA to SWM2 bad ( metal solidify) |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 4 |
Running |
640-16 |
71 |
6 |
7 |
84 |
15.5% |
7.1% |
8.3% |
โ |
| 6 |
Running |
R69-18 |
91 |
4 |
1 |
96 |
5.2% |
4.2% |
1.0% |
โ |
| 7 |
Breakdown |
640-17 |
9 |
1 |
7 |
17 |
47.1% |
5.9% |
41.2% |
โ |
| 14 |
Stopped |
boro |
6 |
5 |
8 |
19 |
68.4% |
26.3% |
42.1% |
continues rej mold stopped |
| 14 |
Breakdown |
R71 |
3 |
3 |
0 |
6 |
50.0% |
50.0% |
0.0% |
โ |
| 15 |
Running |
640-15'' |
99 |
4 |
1 |
104 |
4.8% |
3.9% |
1.0% |
โ |
| 16 |
Running |
R62-18' |
101 |
4 |
1 |
106 |
4.7% |
3.8% |
0.9% |
โ |
| TOTAL PRODUCTION |
432 |
โ | โ | โ | โ |
| TOTAL REJECTION |
52 |
12.0% |
6.3% |
5.8% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| LDPC8 |
ram movement |
720 min |
no action |
to be fixed |
maintance |
Open |
โ |
| LDPC7 |
temperature varation |
480 min |
stopped removed metal handded to maintance |
to be fixed |
maintance |
Open |
โ |
| lpdc14 |
mc cutout during operation |
160 min |
checked only |
to be fixed |
maintance |
Open |
โ |
| lpdc17 |
ram movement |
720 min |
no action |
to be fixed |
maintance |
Open |
โ |
| Die Model | Status | Remarks |
| style 55 |
โ |
โ |
| style 55 |
โ |
โ |
| 640-17' |
โ |
โ |