TOTAL NDT OK
380
Units
TOTAL HC&FC REJECT
27
Units
H&F REJECTION %
6.25%
of total production
NDT REJECTION %
5.79%
of total production
DOWNTIME (min)
2,080
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-17
Shift:
Night
Supervisor:
Al Julanda
Team:
C
Total Attendance:
19
Total Absent:
0
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 forklift without deisal Low Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
32.75 2.05 0.00 30.70 โ€”
HC
min: 24T
18.13
โš  Below minimum
-4.84 0.00 22.97 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad HA to SWM2 bad ( metal solidify)
Hand Over Bad HA to SWM2 bad ( metal solidify)
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-16 71 6 7 84 15.5% 7.1% 8.3% โ€”
6 Running R69-18 91 4 1 96 5.2% 4.2% 1.0% โ€”
7 Breakdown 640-17 9 1 7 17 47.1% 5.9% 41.2% โ€”
14 Stopped boro 6 5 8 19 68.4% 26.3% 42.1% continues rej mold stopped
14 Breakdown R71 3 3 0 6 50.0% 50.0% 0.0% โ€”
15 Running 640-15'' 99 4 1 104 4.8% 3.9% 1.0% โ€”
16 Running R62-18' 101 4 1 106 4.7% 3.8% 0.9% โ€”
TOTAL PRODUCTION 432 โ€”โ€”โ€”โ€”
TOTAL REJECTION 52 12.0% 6.3% 5.8% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
LDPC8 ram movement 720 min no action to be fixed maintance Open โ€”
LDPC7 temperature varation 480 min stopped removed metal handded to maintance to be fixed maintance Open โ€”
lpdc14 mc cutout during operation 160 min checked only to be fixed maintance Open โ€”
lpdc17 ram movement 720 min no action to be fixed maintance Open โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
style 55 โ€” โ€”
style 55 โ€” โ€”
640-17' โ€” โ€”