GENERAL INFORMATION
Date:
2026-06-19
Shift:
Day
Supervisor:
Ahmed Ali
Team:
A
Total Attendance:
9
Total Absent:
7
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 unproper wheels staking in PL area Low Risk
2 water steam over the casting area Medium Risk
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
24.00
โš  Below minimum
24.00 0.00 0.00 โ€”
HC
min: 24T
24.00 24.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet
Hand Over Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
4 Running 640-16"-M1 82 6 4 92 10.9% 6.5% 4.4% โ€”
6 Running R69-18" 86 7 3 96 10.4% 7.3% 3.1% โ€”
7 Running 640-17" 86 5 0 91 5.5% 5.5% 0.0% โ€”
14 Running R71-18" 63 8 17 88 28.4% 9.1% 19.3% โ€”
15 Running 640-16"-4H 61 6 11 78 21.8% 7.7% 14.1% โ€”
16 Running 670-17" 74 6 8 88 15.9% 6.8% 9.1% โ€”
TOTAL PRODUCTION 533 โ€”โ€”โ€”โ€”
TOTAL REJECTION 81 15.2% 7.1% 8.1% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
DM water no water 20 min check and full need to make it auto maintenance team Open yes
LPDC 7 water connection leak water connection leak 45 min maintenance team no maintenance team Closed yes
Deflashing 1 not moving 45 min maintenance team inform no maintenance team Closed yes
convoyer after laser mark lifter not moving 120 min maintenance team inform no maintenance team Closed yes
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
640-17-M1 Completed full service
R69-18" Completed full service
๐Ÿ“
ADDITIONAL REMARKS

1- keep pushing employees to learn about other work . 2- most of the time we receive the gas in Degassing is not replaced and its effect the production with delaying the metal all time I'm asking Mr.Morthy to speck with all other employees in Melting to keep spar not keeping full empty . 3- Die-maintenance need also the same every team doing 1 mold or half of mold and my team doing 2 mold ether one or 2 or 3 employees available 4-most of the LPDC machines barrier cannot stop since no slid door stoper or its misalignment

โœ๏ธ Start a New Report