๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-06-21
Night โ€” Team A
TOTAL NDT OK
230
Units
TOTAL HC&FC REJECT
30
Units
H&F REJECTION %
11.24%
of total production
NDT REJECTION %
2.62%
of total production
DOWNTIME (min)
0
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-06-21
Shift:
Night
Supervisor:
Ahmed Ali
Team:
A
Total Attendance:
14
Total Absent:
1
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
โ€” No observations recorded โ€”
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
28.00 6.12 0.00 21.88 we found havy dross inside the HA so we done the cleaning prosses
HC
min: 24T
14.80
โš  Below minimum
0.00 0.00 14.80 no pump
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 0.00 0.00 0.00 0.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet
Hand Over Bad work is going on for repair from HA to HC half complete From HA to SWM2 not start yet -- extra launder fix to transfer the metal for taping
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
5 Running 640-15" 26 5 2 33 21.2% 15.2% 6.1% stop at 10 PM
6 Running 640-17"-m2 52 7 2 61 14.8% 11.5% 3.3% stop at 10:00pm -- start again 4:30am
7 Stopped 640-17-m1 60 7 1 68 11.8% 10.3% 1.5% stop at 10:00pm -- start again 2:30 am
14 Stopped r62-8" 31 4 1 36 13.9% 11.1% 2.8% stop at 10 PM
16 Running 640-16"-m2 61 7 1 69 11.6% 10.1% 1.5% stop at 10:00pm -- start again 3:30am
TOTAL PRODUCTION 267 โ€”โ€”โ€”โ€”
TOTAL REJECTION 37 13.9% 11.2% 2.6% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
laser mark 2 scaner 0 min maintenance team no maintenance team Closed yes
prehating machine no 1 flaim not working contusions 0 min maintenance team yes maintenance team In Progress yes
LPDC 4 air pressure hose disconnected 0 min maintenance team inform no maintenance team Closed yes
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
R69-18"-M1 Completed full service
640-15"-M1 Completed upper mold + 4 side molds complete
๐Ÿ“
ADDITIONAL REMARKS

While Shaft 5 was running, we noticed that the Holding Furnace (HA) temperature was not reaching the required 800ยฐC. The actual temperature was around 726ยฐC, and after each ladle transfer, the temperature dropped further to approximately 640ยฐC or below. We inspected the HA and found a heavy buildup of dross inside the furnace. The pump was lifted to allow cleaning operations. During the inspection, we found that the impeller was not rotating. We attempted to rotate it manually, but it was completely stuck. At that stage, we suspected either a mechanical failure of the impeller or blockage caused by dross accumulation. After lifting the assembly further, we discovered a piece of metal scrap lodged in the impeller, preventing it from rotating. The scrap may have entered the area during adding element operations or while removing dross from another location inside the furnace. The cleaning was completed, the obstruction was removed, and the pump was reinstalled. Melting operations were restarted at approximately 12:30 PM. As a result of this issue, all casting machines were stopped due to insufficient metal temperature. Even after cleaning, the temperature of the first ladle remained below the required casting temperature. Therefore, the first ladle was blocked and the second ladle was used for casting operations. Root Cause (Suspected): Metal scrap became trapped in the impeller, causing it to stop rotating. Reduced circulation inside the Holding Furnace led to low metal temperature and significant temperature drops during ladle transfers. Impact: Holding Furnace temperature could not reach the required 800ยฐC. Casting operations were interrupted. All casting machines were stopped until corrective actions were completed. Corrective Action: Pump lifted and furnace cleaned. Metal scrap removed from the impeller. Pump reinstalled and melting operations resumed. First low-temperature ladle blocked and the second ladle used for production.

โœ๏ธ Start a New Report