๐ Recent Shifts โ quick switch
Date & Shift
2026-06-22
Day โ Team C
TOTAL HC&FC REJECT
34
Units
H&F REJECTION %
12.98%
of total production
NDT REJECTION %
6.49%
of total production
| No | Observation | Status |
| 1 |
HT rest room ac leak ( dropping water) |
Low Risk |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
21.00 โ Below minimum
|
1.20 |
0.00 |
19.80 |
4.89 Ton rej wheel charged |
| HC
min: 24T
|
14.30 โ Below minimum
|
-5.84 |
0.00 |
20.14 |
5.32 Ton blocks charged |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| Stage | Condition | Comments |
| Received |
Bad |
HA to SWM2 bad ( metal solidify) |
| Hand Over |
Bad |
HA to SWM2 bad ( metal solidify) |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Running |
640-17 |
67 |
12 |
8 |
87 |
23.0% |
13.8% |
9.2% |
โ |
| 7 |
Running |
640-17 |
59 |
12 |
4 |
75 |
21.3% |
16.0% |
5.3% |
โ |
| 16 |
Running |
640-16 |
85 |
10 |
5 |
100 |
15.0% |
10.0% |
5.0% |
โ |
| TOTAL PRODUCTION |
262 |
โ | โ | โ | โ |
| TOTAL REJECTION |
51 |
19.5% |
13.0% |
6.5% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| LDPC8 |
ram movement |
620 min |
โ |
โ |
โ |
Closed |
โ |
| LDPC17 |
ram movement |
720 min |
โ |
to be fixed |
โ |
Open |
โ |
| sprue drlling 1 |
power trip |
320 min |
โ |
to be fixed |
โ |
Open |
โ |
| lpdc5 |
temperature issue |
720 min |
โ |
to be fixed |
โ |
Open |
โ |
| Die Model | Status | Remarks |
| 640-15'' |
Completed |
โ |
| R62 |
Completed |
โ |