๐ Recent Shifts โ quick switch
Date & Shift
2026-05-20
Day โ Team B
TOTAL HC&FC REJECT
33
Units
H&F REJECTION %
10.28%
of total production
NDT REJECTION %
9.35%
of total production
| No | Observation | Status |
| 1 |
L18 H.F door |
Closed |
| 2 |
wheels in floor from previous shift |
Closed |
| Furnace |
Mass Received (Ton) |
Consumed (Ton) |
Metal Added (Ton) |
Mass End of Shift (Ton) |
Remarks |
| HA
min: 28T
|
22.51 โ Below minimum
|
-8.17 |
0.00 |
30.68 |
received S.A crucible (10.88ton) |
| HC
min: 24T
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM1
|
0.00 |
0.00 |
0.00 |
0.00 |
โ |
| SWM2
|
36.40 |
4.40 |
0.00 |
32.00 |
โ |
| Stage | Condition | Comments |
| Received |
Good |
โ |
| Hand Over |
Good |
โ |
| M/C No. |
Status |
Mold Type |
NDT OK |
HC & FC Reject |
NDT Reject |
Total |
Rejection % |
H&F Rej % |
NDT Rej % |
Remarks |
| 6 |
Running |
640-17" |
82 |
5 |
4 |
91 |
9.9% |
5.5% |
4.4% |
โ |
| 8 |
Running |
SMX201-22-M5 |
26 |
7 |
6 |
39 |
33.3% |
18.0% |
15.4% |
โ |
| 16 |
Running |
640-16" |
91 |
6 |
0 |
97 |
6.2% |
6.2% |
0.0% |
โ |
| 17 |
Running |
SMX201-22-M7 |
33 |
8 |
16 |
57 |
42.1% |
14.0% |
28.1% |
โ |
| 18 |
Running |
SMX201-22-M6 |
26 |
7 |
4 |
37 |
29.7% |
18.9% |
10.8% |
โ |
| TOTAL PRODUCTION |
321 |
โ | โ | โ | โ |
| TOTAL REJECTION |
63 |
19.6% |
10.3% |
9.3% |
โ |
| M/C | Issue | DownTime (min) | Action Taken | Pending Action | Responsible | Status | Odoo Notification |
| L18 |
H.F DOOR WIRE DAMAGED |
210 min |
H.F door Wire Changed |
โ |
Maintenance Team |
Closed |
โ |
| Die Model | Status | Remarks |
| CA90-22 |
Completed |
โ |