๐Ÿ• Recent Shifts โ€” quick switch
Date & Shift
2026-05-20
Day โ€” Team B
TOTAL NDT OK
258
Units
TOTAL HC&FC REJECT
33
Units
H&F REJECTION %
10.28%
of total production
NDT REJECTION %
9.35%
of total production
DOWNTIME (min)
210
min
๐Ÿ“‹
GENERAL INFORMATION
Date:
2026-05-20
Shift:
Day
Supervisor:
OMAR
Team:
B
Total Attendance:
11
Total Absent:
5
โš ๏ธ
SAFETY OBSERVATIONS
NoObservationStatus
1 L18 H.F door Closed
2 wheels in floor from previous shift Closed
๐Ÿ”ฅ
FURNACE STATUS
Furnace Mass Received (Ton) Consumed (Ton) Metal Added (Ton) Mass End of Shift (Ton) Remarks
HA
min: 28T
22.51
โš  Below minimum
-8.17 0.00 30.68 received S.A crucible (10.88ton)
HC
min: 24T
0.00 0.00 0.00 0.00 โ€”
SWM1 0.00 0.00 0.00 0.00 โ€”
SWM2 36.40 4.40 0.00 32.00 โ€”
๐ŸŒŠ
LAUNDER CONDITION
StageConditionComments
Received Good โ€”
Hand Over Good โ€”
๐Ÿญ
CASTING PRODUCTION
M/C No. Status Mold Type NDT OK HC & FC Reject NDT Reject Total Rejection % H&F Rej % NDT Rej % Remarks
6 Running 640-17" 82 5 4 91 9.9% 5.5% 4.4% โ€”
8 Running SMX201-22-M5 26 7 6 39 33.3% 18.0% 15.4% โ€”
16 Running 640-16" 91 6 0 97 6.2% 6.2% 0.0% โ€”
17 Running SMX201-22-M7 33 8 16 57 42.1% 14.0% 28.1% โ€”
18 Running SMX201-22-M6 26 7 4 37 29.7% 18.9% 10.8% โ€”
TOTAL PRODUCTION 321 โ€”โ€”โ€”โ€”
TOTAL REJECTION 63 19.6% 10.3% 9.3% โ€”
๐Ÿ”ง
MACHINE BREAKDOWN REPORT
M/CIssueDownTime (min)Action TakenPending ActionResponsibleStatusOdoo Notification
L18 H.F DOOR WIRE DAMAGED 210 min H.F door Wire Changed โ€” Maintenance Team Closed โ€”
๐Ÿ› ๏ธ
DIE MAINTENANCE PLAN
Die ModelStatusRemarks
CA90-22 Completed โ€”